Z&A GreenBuild: Recycling and valorization of construction waste

About Solution

my Z&A GreenBuild project is the necessary solution for a problem that has unfolded in my country since the launch of the housing programs where we have construction sites on all the wilayas of the country, the stock of waste to prevent several development projects, industry and even construction to be carried out, likewise the increase in energy prices to increase the cost of these works; for this why i want realize Z&A GreenBuild, one solution for three problem kinds : econ

I have a recycling and recovery project for waste, especially concrete from demolition and construction waste,

My circular economy project has environmental, economic and social advantages:

1 / Reduces CO2 emissions

2 / It makes it possible to recover the real estate pots used to accumulate this waste

3 / Preserves the natural resources of the raw materials used in the manufacture of new concrete.

4 / Reduces the cost of construction work, public works, urban preparation and the preparation of the sides of the valley from 30% to 50%.

5 / Creates direct and indirect jobs.

This project produces raw materials capable of replacing the raw materials extracted from quarries, providing them at the lowest price and they can be the best in terms of technical characteristics.

This project is environmentally friendly and operates within the framework of the circular economy.

0

Comments

Contact Us

If you have any questions